Print Back to top

Request for Proposal for Blue River Project – FERC Part 12D Comprehensive Assessment

Denver Water owns and operates the Blue River Project (which includes Dillon Dam and appurtenant structures) – FERC No. P-4610.  The Blue River Project is licensed by the Federal Energy Regulatory Commission (FERC) and is also regulated by the Colorado State Engineer’s Office (SEO). FERC’s Division of Dam Safety and Inspections is requiring that Denver Water perform a Comprehensive Assessment (CA) in accordance with the Code of Federal Regulations Title 18, Part 12, Subpart D (Part 12D) by February 19, 2026. Denver Water is inviting your firm to submit proposals to provide one or more of the following services related to the Blue River Project CA: 

  • Independent Consultants(s) (IC) and IC Team (IC Team).
  • Facilitator Team for the Potential Failure Modes Analysis (PFMA) and Level 2 Risk Analysis (L2RA) (Facilitator Team).  
  • Hydrologic Hazard Assessment (HHA) and Life Loss Consequences Study (Technical Studies).
Post Date
Due Date