Powering water operations with clean energy
In November 2024, the Denver Board of Water Commissioners approved a plan to achieve net-zero carbon emissions across all facilities and operations by Dec. 31, 2030.
To support this goal, Denver Water is expanding solar energy systems at several facilities across its service area. These solar installations will help power water operations with clean energy, strengthen infrastructure resilience and support Denver Water’s goal of achieving net-zero carbon emissions by the end of 2030.
Why solar?
Denver Water operates facilities throughout its system that are essential to delivering safe, reliable water to customers every day. Many of these facilities, particularly pump stations, use large amounts of energy because they move water throughout the system.
The solar expansion project will:
- Lower greenhouse gas emissions.
- Reduce reliance on traditional grid power.
- Improve energy resilience and operational reliability.
- Support Denver Water’s goal of achieving net-zero carbon emissions by the end of 2030.
Project locations
Denver Water evaluated more than 30 of its properties that could support solar energy. The evaluation looked at energy demand, available space and site conditions.
Four pump station locations were selected because of their energy needs and ability to support solar infrastructure.
Solar installations are planned at facilities near:
- East 56th Avenue and Quebec Street.
- West Belleview Avenue and South Simms Street.
- West Jewell Avenue and South Garrison Street.
- C-470 and South Quebec Street.
Construction at East 56th Avenue and Quebec Street began in summer 2026. Work at the remaining locations will be completed in phases. All installations are anticipated to be complete by the end of 2027.
What to expect during construction
Construction activities include:
- Installing solar panel arrays within existing Denver Water property boundaries.
- Connecting solar systems to pump station operations.
- Completing related electrical and infrastructure improvements.
Construction may temporarily result in:
- Noise during work hours.
- Construction-related vehicle traffic.
- Dust associated with work activities.
Denver Water will work to minimize impacts and provide updates before major construction activities begin.
FAQs
Denver Water is upgrading facilities as part of its long-term commitment to sustainability and reliable operations. Solar energy helps reduce greenhouse gas emissions, supports Denver Water’s net-zero goals, helps reduce our reliance on grid power and strengthens the resilience of critical water infrastructure.
Construction began at East 56th Avenue and Quebec Street in summer 2026. The remaining installations are anticipated to be completed by the end of 2027. Work at each location may last from several weeks to a few months, depending on weather and site conditions.
Denver Water will share construction schedules and project updates as work moves forward.
No. Solar panels and supporting infrastructure will be installed within existing Denver Water property boundaries. The project will not expand facility footprints.
The solar panels are designed to reduce glare and reflection. Designed to absorb sunlight efficiently, modern solar panels typically reflect less light than many common surfaces, such as windows or water. While minor reflections may occur in certain lighting conditions, significant glare is not anticipated.
No. Once construction is complete, solar panels operate quietly and will not increase traffic at the facility. Any noticeable noise or traffic will be temporary and limited to the construction period.
The solar panels may be visible from some nearby streets or properties. However, they will remain within the existing facility boundaries and will be consistent with the industrial character of the sites.
No. This project supports Denver Water operations and will not affect nearby residents’ electric service or utility bills.
Denver Water will follow best practices to minimize temporary impacts, such as dust, noise and potential effects on wildlife. Long-term, the project will provide environmental benefits by reducing greenhouse gas emissions and increasing clean energy generation.
Where landscaping is needed, Denver Water will prioritize ColoradoScape principles and water-wise practices that support long-term sustainability and reduce maintenance demands.
Call Denver Water Customer Care at 303‑893‑2444 from 7:30 a.m. to 5:30 p.m., Monday through Friday, or email us.